Process Overview
This is a case where Bigwave Robotics (Marosol) installed the second-generation LG CLOi double-door delivery robot at Hallym University Kangnam Sacred Heart Hospital for medication delivery. The second-generation LG CLOi double-door delivery robot was connected to SOLlink, which was used to build infrastructure such as elevators and automatic doors, so that medicine could be delivered from the pharmacy on the first floor to the nursing stations in each ward.
Warranty Period
- 1 Year
Performance Year
- 2024
Project Duration
- Infrastructure construction: 2 weeks
- Total project: 3 weeks
Project Background and Objectives
- Replace workers in times of labor shortages.
- Reduce worker travel time and free up workers for other tasks.
- Maximize efficiency of repetitive tasks.
- Remote control and status monitoring using SOLlink.
Components
| Robot | LG CLOi double-door delivery robot |
|---|---|
| Peripherals | Integrated Multi-Robot Control System, SOLlink |
Workflow
| STEP 1. | Call the robot with SOLlink. |
|---|---|
| STEP 2. | Enter the ward nursing station where the medication will be delivered. |
| STEP 3. | Move the robot to nursing station. |
| STEP 4. | Move to the front of the EV. |
| STEP 5. | Call the EV |
| STEP 6. | Select the floor to be transported after boarding the EV. |
| STEP 7. | Exit the EV upon arriving at the selected floor. |
| STEP 8. | Move to the front of the automatic door. |
| STEP 9. | Signal the automatic door to open. |
| STEP 10. | Pass through the automatic door and arrive at the nursing station. |
| STEP 11. | Enter the password and receive the medication. |
| STEP 12. | If there is another medication to be delivered, deliver it. If not, move to the robot waiting area. |
β» The content provided by Bigwave Robotics is protected under U.S. and Canadian copyright and intellectual property laws. Unauthorized reproduction, distribution, or use of this content is strictly prohibited.
Recommended Use Cases
Three LG CLOi guide robots will accompany patients throughout their examinations! π₯π€ (LG CLOi guide robots introduced at Haeundae Baek Hospital in Busan)
Process Overview This is a case study of Bigwave Robotics (Marosol) deploying three guide robots at Haeundae Paik Hospital to automate patient navigation. Using the LG CLOi guide robots, the hospital automatically guided patients through their examinations. The three guide robots were interconnected using the SOLlink integrated robot control system. This enabled seamless guidance for patients moving between floors. Warranty Period 1 Year Performance Year 2024 Project Background and Objectives Robots don't board elevators; patients move between floors. Robots on each floor are interconnected through a highly integrated control system (relay function). This system accompanies and guides patients as they move between floors.
Hanlim University Sacred Heart Hospital β Yujin Robot GoCart180
Process Overview Bigwave Robotics (Marosol) deployed a logistics robot, GoCart180, at Hanrim Daesung Hospital. One unit was installed in the surgery center to transport high-payload medical materials and support clinical staff operations. Warranty Period : 1 year Project Year : 2023 Project Duration : 1 day Project Background and Objectives Transport heavy or bulky items that are difficult for staff to carry manually. Support medical staff and enable rapid response to address growing healthcare operational challenges driven by an aging population. Help prevent musculoskeletal disorders by reducing manual handling load.
Process Overview
This is a case where Bigwave Robotics (Marosol) installed the second-generation LG CLOi double-door delivery robot at Hallym University Kangnam Sacred Heart Hospital for medication delivery. The second-generation LG CLOi double-door delivery robot was connected to SOLlink, which was used to build infrastructure such as elevators and automatic doors, so that medicine could be delivered from the pharmacy on the first floor to the nursing stations in each ward.
Warranty Period
- 1 Year
Performance Year
- 2024
Project Duration
- Infrastructure construction: 2 weeks
- Total project: 3 weeks
Project Background and Objectives
- Replace workers in times of labor shortages.
- Reduce worker travel time and free up workers for other tasks.
- Maximize efficiency of repetitive tasks.
- Remote control and status monitoring using SOLlink.
Components
| Robot | LG CLOi double-door delivery robot |
|---|---|
| Peripherals | Integrated Multi-Robot Control System, SOLlink |
Workflow
| STEP 1. | Call the robot with SOLlink. |
|---|---|
| STEP 2. | Enter the ward nursing station where the medication will be delivered. |
| STEP 3. | Move the robot to nursing station. |
| STEP 4. | Move to the front of the EV. |
| STEP 5. | Call the EV |
| STEP 6. | Select the floor to be transported after boarding the EV. |
| STEP 7. | Exit the EV upon arriving at the selected floor. |
| STEP 8. | Move to the front of the automatic door. |
| STEP 9. | Signal the automatic door to open. |
| STEP 10. | Pass through the automatic door and arrive at the nursing station. |
| STEP 11. | Enter the password and receive the medication. |
| STEP 12. | If there is another medication to be delivered, deliver it. If not, move to the robot waiting area. |
β» The content provided by Bigwave Robotics is protected under U.S. and Canadian copyright and intellectual property laws. Unauthorized reproduction, distribution, or use of this content is strictly prohibited.