Process Overview
Bigwave Robotics (Marosol) established an automated assembly line for console parts for Kia Motors' newly launched SUV-type electric vehicle.
The existing console assembly line is a large-scale assembly line, requiring an average of 40-60 workers to assemble manually. The lack of automation experience presented challenges in securing space and recruiting assembly workers.
Frequent staff turnover and resulting skill level issues hindered productivity. To address this, the company replaced some workers with robots, addressing the labor shortage and consistently ensuring productivity by adapting to the changing workforce.
Warranty Period
- 1 Year
Performance Year
- 2024
Project Duration
- 4 Months
Project Background and Objectives
- Building a multi-product automated production line and reducing labor costs through robotic automation
- Preventing mis-assembly and mis-assembly using a lot-of-lot system and ensuring traceability
- Remote control and integrated management using SOLlink
Components
| Robot | The line utilizes Seiko EPSON's LS-b series, a proven product that has held the number one global market share in SCARA robots for 12 consecutive years, and the C series industrial robot.
The LS-b series boasts specifications ranging from a payload of 3 to 20 kg, a repeatability accuracy of ±0.02 mm, and a standard cycle time of 0.4 seconds. EPSON specializes in small robots, focusing on high-speed, high-precision, and low-vibration performance. |
|---|
Workflow
| STEP 1. | The new console parts for SUV-type electric vehicles are largely divided into three parts, each operated on a separate production line. The daily production volume for each line is recorded using the LOT system, with the vehicle type and quantity entered. Based on this data, each product is assigned a number and then production is conducted. |
|---|---|
| STEP 2. | The parts that go into each product are set up on the equipment by the worker, and the part information is linked to the LOT system through a barcode to manage inspection of different parts and missing parts. In normal operation, the robot fastens and assembles the product. |
| STEP 3. | The first line is a flow production line utilizing a conveyor, and the production parts include a wireless charger, a cup holder, and a tray for storing luggage. Due to the nature of the product, it is large in size and the fastening location is at the rear, so it was built as a conveyor type line to simultaneously secure operator operability. |
| STEP 4. | The second line is a standalone modular line, which is the largest part of the console parts, corresponding to the body. Since the assembly section is very small compared to its size, it is a line that is operated as a single unit. |
| STEP 5. | The third line assembles the parts that serve as pillars for the console, which is where the most parts are assembled. Unlike the two products above, this line combines three parts into one instead of assembling one part. Since the assembly time and method for each assembly section vary depending on the vehicle option, the equipment was implemented with a modular concept rather than a conveyor type. As products move through each process, the data is tracked and assembled using LOT barcodes to prevent heterogeneous product assembly. Since there are many product assembly sections, this is the section with the most robots. While other lines only perform vertical fastening, the third line also performs lateral fastening, so it also uses the C series, a multi-joint robot. |
※ The content provided by Bigwave Robotics is protected under U.S. and Canadian copyright and intellectual property laws. Unauthorized reproduction, distribution, or use of this content is strictly prohibited.
Recommended Use Cases
A Robot-Built Home?! SPACE FACTORY : Automation of window assembly for modular houses! 🛠️🏠
Process Overview This deployment is the first domestic solution that automates modular housing window-frame assembly by combining KUKA industrial robots, a custom-designed robot gripper, and High Payload Track Motion. SPACE FACTORY introduced this window-frame assembly automation system to reduce construction costs and to produce modular housing with consistent quality. Project Background and Objectives In the existing operation, skilled technicians assembled sash frames manually, which required long working time, and significant manpower was needed to respond to diverse customer requirements. In addition, due to the wide work environment and the complex robot operating environment, real-time monitoring was difficult, creating limitations in process management. The objective of this project is to dramatically reduce working time by automating the window-frame assembly process, build a standardized production system to ensure consistent quality, and maximize process management efficiency through a real-time production monitoring system.
Successfully automated the Samlak heat treatment loading process!🙌 We even built a perfect jig design. (ft. Hyundai Robotics Industrial Robot)
Process Overview This project involved the introduction of automated loading/unloading to ensure uniform heat treatment of the carrier mid-planet , a key component of automotive transmissions. The client implemented automation to address several issues arising from the previously manual process, particularly the increased defect rate and inefficiencies caused by worker s. Hyundai Robotics' HH050 six-axis industrial robot was utilized for this purpose, automating various tasks such as product stacking, pin insertion, and tray placement , ensuring high productivity and stability. Warranty Period 1 Year Performance Year 2024 Project Duration 3 Months
Yaskawa Industrial Robots + Automatic Foam Placement — Hankook & Company Battery Palletizing Automation Case 🔋🤖
Process Overview Hankook & Company's palletizing solution prioritizes higher output and reduced labor requirements. After removing the existing line that was built around a single palletizer, the operation was split into two lines and reconfigured with two palletizers to secure production capacity (CAPA). In addition, manual placement of styrofoam and slip sheets was automated to reduce operator intervention—enabling one operator to manage both lines. Project Background and Objectives Background The previous workflow had an imbalance between line production capacity (CAPA) and palletizing capacity (CAPA), requiring operators to manually support styrofoam and slip-sheet placement to maintain output. This structure forced continuous loading of slip sheets (approx. 7 kg each), causing significant operator fatigue. Also, the line had to wait until manual slip-sheet loading was completed, leading to large fluctuations in the logistics cycle time. Key issues Palletizing quality instability and speed loss caused by manual operations Reduced productivity, increased operator fatigue, and skilled-labor dependency issues Objectives Improve production efficiency by minimizing repetitive manual tasks through upgraded robot automation Ensure quality consistency by reducing manual intervention Improve the work environment by reducing operator fatigue and strengthening safety
Process Overview
Bigwave Robotics (Marosol) established an automated assembly line for console parts for Kia Motors' newly launched SUV-type electric vehicle.
The existing console assembly line is a large-scale assembly line, requiring an average of 40-60 workers to assemble manually. The lack of automation experience presented challenges in securing space and recruiting assembly workers.
Frequent staff turnover and resulting skill level issues hindered productivity. To address this, the company replaced some workers with robots, addressing the labor shortage and consistently ensuring productivity by adapting to the changing workforce.
Warranty Period
- 1 Year
Performance Year
- 2024
Project Duration
- 4 Months
Project Background and Objectives
- Building a multi-product automated production line and reducing labor costs through robotic automation
- Preventing mis-assembly and mis-assembly using a lot-of-lot system and ensuring traceability
- Remote control and integrated management using SOLlink
Components
| Robot | The line utilizes Seiko EPSON's LS-b series, a proven product that has held the number one global market share in SCARA robots for 12 consecutive years, and the C series industrial robot.
The LS-b series boasts specifications ranging from a payload of 3 to 20 kg, a repeatability accuracy of ±0.02 mm, and a standard cycle time of 0.4 seconds. EPSON specializes in small robots, focusing on high-speed, high-precision, and low-vibration performance. |
|---|
Workflow
| STEP 1. | The new console parts for SUV-type electric vehicles are largely divided into three parts, each operated on a separate production line. The daily production volume for each line is recorded using the LOT system, with the vehicle type and quantity entered. Based on this data, each product is assigned a number and then production is conducted. |
|---|---|
| STEP 2. | The parts that go into each product are set up on the equipment by the worker, and the part information is linked to the LOT system through a barcode to manage inspection of different parts and missing parts. In normal operation, the robot fastens and assembles the product. |
| STEP 3. | The first line is a flow production line utilizing a conveyor, and the production parts include a wireless charger, a cup holder, and a tray for storing luggage. Due to the nature of the product, it is large in size and the fastening location is at the rear, so it was built as a conveyor type line to simultaneously secure operator operability. |
| STEP 4. | The second line is a standalone modular line, which is the largest part of the console parts, corresponding to the body. Since the assembly section is very small compared to its size, it is a line that is operated as a single unit. |
| STEP 5. | The third line assembles the parts that serve as pillars for the console, which is where the most parts are assembled. Unlike the two products above, this line combines three parts into one instead of assembling one part. Since the assembly time and method for each assembly section vary depending on the vehicle option, the equipment was implemented with a modular concept rather than a conveyor type. As products move through each process, the data is tracked and assembled using LOT barcodes to prevent heterogeneous product assembly. Since there are many product assembly sections, this is the section with the most robots. While other lines only perform vertical fastening, the third line also performs lateral fastening, so it also uses the C series, a multi-joint robot. |
※ The content provided by Bigwave Robotics is protected under U.S. and Canadian copyright and intellectual property laws. Unauthorized reproduction, distribution, or use of this content is strictly prohibited.